Revamp tracking schedule building #164
rust.yaml
on: pull_request
Check
1m 52s
Matrix: tests
Coverage (unit tests only)
0s
Release
0s
Annotations
6 errors
Tests (ubuntu-latest, stable)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Tests (ubuntu-latest, stable)
The operation was canceled.
|
Tests (windows-latest, stable)
The job was canceled because "ubuntu-latest_stable_stab" failed.
|
Tests (windows-latest, stable)
The operation was canceled.
|
Tests (macos-latest, stable)
The job was canceled because "ubuntu-latest_stable_stab" failed.
|
Tests (macos-latest, stable)
The operation was canceled.
|