Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

[RELEASE] 0.13.0 #589

Merged
merged 43 commits into from
Dec 20, 2024
Merged

[RELEASE] 0.13.0 #589

merged 43 commits into from
Dec 20, 2024

Conversation

aziolek
Copy link
Member

@aziolek aziolek commented Dec 16, 2024

Description

Definition of Done

  1. If required, the desciption of your change is added to the QA changelog
  2. Acceptance criteria are met.
  3. PR is manually tested before the merge by developer(s).
    • Happy path is manually checked.
  4. PR is manually tested by QA when their assistance is required (1).
    • Octant Areas & Test Cases are checked for impact and updated if required (2).
  5. Unit tests are added unless there is a reason to omit them.
  6. Automated tests are added when required.
  7. The code is merged.
  8. Tech documentation is added / updated, reviewed and approved (including mandatory approval by a code owner, should such exist for changed files).
    • BE: Swagger documentation is updated.
  9. When required by QA:
    • Deployed to the relevant environment.
    • Passed system tests.

(1) Developer(s) in coordination with QA decide whether it's required. For small tickets introducing small changes QA assistance is most probably not required.

(2) Octant Areas & Test Cases.

aziolek and others added 30 commits November 14, 2024 12:06
## Description
Switched to using newer signature verifier, removed unused code

## Definition of Done

1. [ ] If required, the desciption of your change is added to the [QA
changelog](https://www.notion.so/octantapp/Changelog-for-the-QA-d96fa3b411cf488bb1d8d9a598d88281)
2. [ ] Acceptance criteria are met.
3. [ ] PR is manually tested before the merge by developer(s).
    - [ ] Happy path is manually checked.
4. [ ] PR is manually tested by QA when their assistance is required
(1).
- [ ] Octant Areas & Test Cases are checked for impact and updated if
required (2).
5. [ ] Unit tests are added unless there is a reason to omit them.
6. [ ] Automated tests are added when required.
7. [ ] The code is merged.
8. [ ] Tech documentation is added / updated, reviewed and approved
(including mandatory approval by a code owner, should such exist for
changed files).
    - [ ] BE: Swagger documentation is updated.
9. [ ] When required by QA:
    - [ ] Deployed to the relevant environment.
    - [ ] Passed system tests.

---

(1) Developer(s) in coordination with QA decide whether it's required.
For small tickets introducing small changes QA assistance is most
probably not required.

(2) [Octant Areas & Test
Cases](https://docs.google.com/spreadsheets/d/1cRe6dxuKJV3a4ZskAwWEPvrFkQm6rEfyUCYwLTYw_Cc).
## Description

## Definition of Done

1. [ ] If required, the desciption of your change is added to the [QA
changelog](https://www.notion.so/octantapp/Changelog-for-the-QA-d96fa3b411cf488bb1d8d9a598d88281)
2. [ ] Acceptance criteria are met.
3. [ ] PR is manually tested before the merge by developer(s).
    - [ ] Happy path is manually checked.
4. [ ] PR is manually tested by QA when their assistance is required
(1).
- [ ] Octant Areas & Test Cases are checked for impact and updated if
required (2).
5. [ ] Unit tests are added unless there is a reason to omit them.
6. [ ] Automated tests are added when required.
7. [ ] The code is merged.
8. [ ] Tech documentation is added / updated, reviewed and approved
(including mandatory approval by a code owner, should such exist for
changed files).
    - [ ] BE: Swagger documentation is updated.
9. [ ] When required by QA:
    - [ ] Deployed to the relevant environment.
    - [ ] Passed system tests.

---

(1) Developer(s) in coordination with QA decide whether it's required.
For small tickets introducing small changes QA assistance is most
probably not required.

(2) [Octant Areas & Test
Cases](https://docs.google.com/spreadsheets/d/1cRe6dxuKJV3a4ZskAwWEPvrFkQm6rEfyUCYwLTYw_Cc).

---------

Co-authored-by: Pawel Peregud <[email protected]>
## Description

## Definition of Done

1. [ ] If required, the desciption of your change is added to the [QA
changelog](https://www.notion.so/octantapp/Changelog-for-the-QA-d96fa3b411cf488bb1d8d9a598d88281)
2. [ ] Acceptance criteria are met.
3. [ ] PR is manually tested before the merge by developer(s).
    - [ ] Happy path is manually checked.
4. [ ] PR is manually tested by QA when their assistance is required
(1).
- [ ] Octant Areas & Test Cases are checked for impact and updated if
required (2).
5. [ ] Unit tests are added unless there is a reason to omit them.
6. [ ] Automated tests are added when required.
7. [ ] The code is merged.
8. [ ] Tech documentation is added / updated, reviewed and approved
(including mandatory approval by a code owner, should such exist for
changed files).
    - [ ] BE: Swagger documentation is updated.
9. [ ] When required by QA:
    - [ ] Deployed to the relevant environment.
    - [ ] Passed system tests.

---

(1) Developer(s) in coordination with QA decide whether it's required.
For small tickets introducing small changes QA assistance is most
probably not required.

(2) [Octant Areas & Test
Cases](https://docs.google.com/spreadsheets/d/1cRe6dxuKJV3a4ZskAwWEPvrFkQm6rEfyUCYwLTYw_Cc).
## Description

## Definition of Done

1. [ ] If required, the desciption of your change is added to the [QA
changelog](https://www.notion.so/octantapp/Changelog-for-the-QA-d96fa3b411cf488bb1d8d9a598d88281)
2. [ ] Acceptance criteria are met.
3. [ ] PR is manually tested before the merge by developer(s).
    - [ ] Happy path is manually checked.
4. [ ] PR is manually tested by QA when their assistance is required
(1).
- [ ] Octant Areas & Test Cases are checked for impact and updated if
required (2).
5. [ ] Unit tests are added unless there is a reason to omit them.
6. [ ] Automated tests are added when required.
7. [ ] The code is merged.
8. [ ] Tech documentation is added / updated, reviewed and approved
(including mandatory approval by a code owner, should such exist for
changed files).
    - [ ] BE: Swagger documentation is updated.
9. [ ] When required by QA:
    - [ ] Deployed to the relevant environment.
    - [ ] Passed system tests.

---

(1) Developer(s) in coordination with QA decide whether it's required.
For small tickets introducing small changes QA assistance is most
probably not required.

(2) [Octant Areas & Test
Cases](https://docs.google.com/spreadsheets/d/1cRe6dxuKJV3a4ZskAwWEPvrFkQm6rEfyUCYwLTYw_Cc).
## Description

## Definition of Done

1. [ ] If required, the desciption of your change is added to the [QA
changelog](https://www.notion.so/octantapp/Changelog-for-the-QA-d96fa3b411cf488bb1d8d9a598d88281)
2. [ ] Acceptance criteria are met.
3. [ ] PR is manually tested before the merge by developer(s).
    - [ ] Happy path is manually checked.
4. [ ] PR is manually tested by QA when their assistance is required
(1).
- [ ] Octant Areas & Test Cases are checked for impact and updated if
required (2).
5. [ ] Unit tests are added unless there is a reason to omit them.
6. [ ] Automated tests are added when required.
7. [ ] The code is merged.
8. [ ] Tech documentation is added / updated, reviewed and approved
(including mandatory approval by a code owner, should such exist for
changed files).
    - [ ] BE: Swagger documentation is updated.
9. [ ] When required by QA:
    - [ ] Deployed to the relevant environment.
    - [ ] Passed system tests.

---

(1) Developer(s) in coordination with QA decide whether it's required.
For small tickets introducing small changes QA assistance is most
probably not required.

(2) [Octant Areas & Test
Cases](https://docs.google.com/spreadsheets/d/1cRe6dxuKJV3a4ZskAwWEPvrFkQm6rEfyUCYwLTYw_Cc).
## Description
Migration of the following endpoints to use FastAPI instead of Flask implementation.
```
   + GET /allocations/epoch/{epoch}
   + GET /allocations/users/{address}/allocation_nonce
   + POST /allocations/allocate
   + GET /allocations/donors/{epoch}
   + GET /allocations/project/{proposal_address}/epoch/{epoch}
   + GET /allocations/user/{user_address}/epoch/{epoch}
 ```
## Description

## Definition of Done

1. [ ] If required, the desciption of your change is added to the [QA
changelog](https://www.notion.so/octantapp/Changelog-for-the-QA-d96fa3b411cf488bb1d8d9a598d88281)
2. [ ] Acceptance criteria are met.
3. [ ] PR is manually tested before the merge by developer(s).
    - [ ] Happy path is manually checked.
4. [ ] PR is manually tested by QA when their assistance is required
(1).
- [ ] Octant Areas & Test Cases are checked for impact and updated if
required (2).
5. [ ] Unit tests are added unless there is a reason to omit them.
6. [ ] Automated tests are added when required.
7. [ ] The code is merged.
8. [ ] Tech documentation is added / updated, reviewed and approved
(including mandatory approval by a code owner, should such exist for
changed files).
    - [ ] BE: Swagger documentation is updated.
9. [ ] When required by QA:
    - [ ] Deployed to the relevant environment.
    - [ ] Passed system tests.

---

(1) Developer(s) in coordination with QA decide whether it's required.
For small tickets introducing small changes QA assistance is most
probably not required.

(2) [Octant Areas & Test
Cases](https://docs.google.com/spreadsheets/d/1cRe6dxuKJV3a4ZskAwWEPvrFkQm6rEfyUCYwLTYw_Cc).
## Description

## Definition of Done

1. [ ] If required, the desciption of your change is added to the [QA
changelog](https://www.notion.so/octantapp/Changelog-for-the-QA-d96fa3b411cf488bb1d8d9a598d88281)
2. [ ] Acceptance criteria are met.
3. [ ] PR is manually tested before the merge by developer(s).
    - [ ] Happy path is manually checked.
4. [ ] PR is manually tested by QA when their assistance is required
(1).
- [ ] Octant Areas & Test Cases are checked for impact and updated if
required (2).
5. [ ] Unit tests are added unless there is a reason to omit them.
6. [ ] Automated tests are added when required.
7. [ ] The code is merged.
8. [ ] Tech documentation is added / updated, reviewed and approved
(including mandatory approval by a code owner, should such exist for
changed files).
    - [ ] BE: Swagger documentation is updated.
9. [ ] When required by QA:
    - [ ] Deployed to the relevant environment.
    - [ ] Passed system tests.

---

(1) Developer(s) in coordination with QA decide whether it's required.
For small tickets introducing small changes QA assistance is most
probably not required.

(2) [Octant Areas & Test
Cases](https://docs.google.com/spreadsheets/d/1cRe6dxuKJV3a4ZskAwWEPvrFkQm6rEfyUCYwLTYw_Cc).
## Description

## Definition of Done

1. [ ] If required, the desciption of your change is added to the [QA
changelog](https://www.notion.so/octantapp/Changelog-for-the-QA-d96fa3b411cf488bb1d8d9a598d88281)
2. [ ] Acceptance criteria are met.
3. [ ] PR is manually tested before the merge by developer(s).
    - [ ] Happy path is manually checked.
4. [ ] PR is manually tested by QA when their assistance is required
(1).
- [ ] Octant Areas & Test Cases are checked for impact and updated if
required (2).
5. [ ] Unit tests are added unless there is a reason to omit them.
6. [ ] Automated tests are added when required.
7. [ ] The code is merged.
8. [ ] Tech documentation is added / updated, reviewed and approved
(including mandatory approval by a code owner, should such exist for
changed files).
    - [ ] BE: Swagger documentation is updated.
9. [ ] When required by QA:
    - [ ] Deployed to the relevant environment.
    - [ ] Passed system tests.

---

(1) Developer(s) in coordination with QA decide whether it's required.
For small tickets introducing small changes QA assistance is most
probably not required.

(2) [Octant Areas & Test
Cases](https://docs.google.com/spreadsheets/d/1cRe6dxuKJV3a4ZskAwWEPvrFkQm6rEfyUCYwLTYw_Cc).

---------

Signed-off-by: Marek Słomnicki <[email protected]>
Co-authored-by: Jakub Mikołajczyk <[email protected]>
Co-authored-by: Jakub Mikołajczyk <[email protected]>
Co-authored-by: Andrzej Ziółek <[email protected]>
Co-authored-by: Housekeeper Bot <[email protected]>
Co-authored-by: adam-gf <[email protected]>
Co-authored-by: Pawel Peregud <[email protected]>
Co-authored-by: Marek Słomnicki <[email protected]>
## Description

## Definition of Done

1. [ ] If required, the desciption of your change is added to the [QA
changelog](https://www.notion.so/octantapp/Changelog-for-the-QA-d96fa3b411cf488bb1d8d9a598d88281)
2. [ ] Acceptance criteria are met.
3. [ ] PR is manually tested before the merge by developer(s).
    - [ ] Happy path is manually checked.
4. [ ] PR is manually tested by QA when their assistance is required
(1).
- [ ] Octant Areas & Test Cases are checked for impact and updated if
required (2).
5. [ ] Unit tests are added unless there is a reason to omit them.
6. [ ] Automated tests are added when required.
7. [ ] The code is merged.
8. [ ] Tech documentation is added / updated, reviewed and approved
(including mandatory approval by a code owner, should such exist for
changed files).
    - [ ] BE: Swagger documentation is updated.
9. [ ] When required by QA:
    - [ ] Deployed to the relevant environment.
    - [ ] Passed system tests.

---

(1) Developer(s) in coordination with QA decide whether it's required.
For small tickets introducing small changes QA assistance is most
probably not required.

(2) [Octant Areas & Test
Cases](https://docs.google.com/spreadsheets/d/1cRe6dxuKJV3a4ZskAwWEPvrFkQm6rEfyUCYwLTYw_Cc).
@housekeeper-bot housekeeper-bot temporarily deployed to uat December 16, 2024 13:53 Destroyed
@housekeeper-bot housekeeper-bot temporarily deployed to uat December 16, 2024 15:06 Destroyed
@housekeeper-bot housekeeper-bot temporarily deployed to uat December 17, 2024 08:56 Destroyed
@housekeeper-bot housekeeper-bot temporarily deployed to uat December 17, 2024 13:47 Destroyed
housekeeper-bot and others added 2 commits December 17, 2024 13:54
…it (#594)

## Description

To better handle the pool size of postgres we lowered the pool size from
100 and moved params to dedicated config.
The issue probably is due to the fact that pg has (default) 100
connection and pool size of sqlalchemy was equal to it, causing
overflows / connection drops because of reached limit.
Copy link
Contributor

@adam-gf adam-gf left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

🚀
MEGA = Make E2Es Green Again

@adam-gf adam-gf added the request-approval Request approval from the Housekeeper label Dec 19, 2024
@housekeeper-bot housekeeper-bot removed the request-approval Request approval from the Housekeeper label Dec 19, 2024
Copy link
Contributor

@housekeeper-bot housekeeper-bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

E2E job #12409554794 failed 💥

@aziolek aziolek added the request-approval Request approval from the Housekeeper label Dec 19, 2024
Copy link
Contributor

@MateuszStoleckiGLM MateuszStoleckiGLM left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM!

@housekeeper-bot housekeeper-bot removed the request-approval Request approval from the Housekeeper label Dec 19, 2024
Copy link
Contributor

@housekeeper-bot housekeeper-bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

E2E job #12411716507 failed 💥

@aziolek aziolek added the request-approval Request approval from the Housekeeper label Dec 20, 2024
@housekeeper-bot housekeeper-bot removed the request-approval Request approval from the Housekeeper label Dec 20, 2024
Copy link
Contributor

@housekeeper-bot housekeeper-bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

E2E job #12429094948 failed 💥

@aziolek
Copy link
Member Author

aziolek commented Dec 20, 2024

One E2E job failed that I will investigate today. I merge the release.

@aziolek aziolek merged commit 8e2df16 into master Dec 20, 2024
61 of 62 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

5 participants