You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
When I switch the period to 1D, 1W, and 1M, the date of the timeline is one day earlier than the real data, but the data of the switching period S, m, and h is normal
When I switched the period to 1D, the date on the timeline was one day ahead of the real data
The text was updated successfully, but these errors were encountered: