standard_cost_inventory.cra
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
Project Type System Subsystem Components $ per kW
Floating Offshore CapEx Turbine Rotor nacelle assembly 1119
Floating Offshore CapEx Turbine Tower 182
Floating Offshore CapEx Balance of system Development 85
Floating Offshore CapEx Balance of system Project management 2
Floating Offshore CapEx Balance of system Substructure and foundation Substructure 1293
Floating Offshore CapEx Balance of system Substructure and foundation Foundation 703
Floating Offshore CapEx Balance of system Electrical infrastructure Array cable system 174
Floating Offshore CapEx Balance of system Electrical infrastructure Export cable system 323
Floating Offshore CapEx Balance of system Electrical infrastructure Grid connection 182
Floating Offshore CapEx Balance of system Electrical infrastructure Assembly and installation 302
Floating Offshore CapEx Balance of system Lease price 170
Floating Offshore CapEx Soft costs Insurance during construction 49
Floating Offshore CapEx Soft costs Decommissioning bond 97
Floating Offshore CapEx Soft costs Construction finance 211
Floating Offshore CapEx Soft costs Sponsor contingency Procurement contingency 215
Floating Offshore CapEx Soft costs Sponsor contingency Installation contingency 194
Floating Offshore CapEx Soft costs Project completions/commissioning 49
Floating Offshore OpEx Operations 30
Floating Offshore OpEx Maintenance 88
Land-Based CapEx Turbine Rotor module Blades 203
Land-Based CapEx Turbine Rotor module Pitch assembly 63
Land-Based CapEx Turbine Rotor module Hub assembly 48
Land-Based CapEx Turbine Nacelle module Structural assembly 103
Land-Based CapEx Turbine Nacelle module Drivetrain assembly 205
Land-Based CapEx Turbine Nacelle module Electrical assembly 166
Land-Based CapEx Turbine Nacelle module Yaw assembly 38
Land-Based CapEx Turbine Tower module 204
Land-Based CapEx Blance of System Development 23
Land-Based CapEx Blance of System Engineering and project management 10
Land-Based CapEx Blance of System Foundation 75
Land-Based CapEx Blance of System Site access and staging 40
Land-Based CapEx Blance of System Assembly and installation 41
Land-Based CapEx Blance of System Electrical infrastructure 132
Land-Based CapEx Soft Costs Contingency 88
Land-Based OpEx 43
Fixed Bottom Offshore CapEx Turbine Rotor nacelle assembly 1119
Fixed Bottom Offshore CapEx Turbine Tower 182
Fixed Bottom Offshore CapEx Balance of system Development 85
Fixed Bottom Offshore CapEx Balance of system Project management 2
Fixed Bottom Offshore CapEx Balance of system Substructure and foundation Substructure 185
Fixed Bottom Offshore CapEx Balance of system Substructure and foundation Foundation 289
Fixed Bottom Offshore CapEx Balance of system Substructure and foundation Array cable system 112
Fixed Bottom Offshore CapEx Balance of system Substructure and foundation Export cable system 370
Fixed Bottom Offshore CapEx Balance of system Substructure and foundation Grid connection 180
Fixed Bottom Offshore CapEx Balance of system Assembly and installation Turbine installation 212
Fixed Bottom Offshore CapEx Balance of system Assembly and installation Substructure and foundation installation 178
Fixed Bottom Offshore CapEx Balance of system Lease price 170
Fixed Bottom Offshore CapEx Soft Costs Insurance during construction 33
Fixed Bottom Offshore CapEx Soft Costs Decommissioning bond 111
Fixed Bottom Offshore CapEx Soft Costs Construction finanace 145
Fixed Bottom Offshore CapEx Soft Costs Sponsor contingency Procurement contingency 127
Fixed Bottom Offshore CapEx Soft Costs Sponsor contingency Installation contingency 223
Fixed Bottom Offshore CapEx Soft Costs Project completions/comissioning 33
Fixed Bottom Offshore OpEx Operations 30
Fixed Bottom Offshore OpEx Maintenance 80